← All policy documents · Trade & Rules

Notice on matters concerning the orderly promotion of green-power direct connection

China · In force · Record WA-DOC-2025-0108

Document numberFagai Nengyuan [2025] No. 650
IssuerNational Development and Reform Commission (NDRC); National Energy Administration (NEA)
JurisdictionChina
Issued2025-05-21
Effective2025-05-21
Review date2027-11-20
StatusIn force
Domaingrid, green-power, direct-connection
WattAnalysis recordWA-DOC-2025-0108
SourceOfficial source (issuing authority) — tier T1, credibility A
Record updated2026-11-22

Measures under this document

ProductMeasureRateHS / HTS codesEffectiveStatus
Single-user green-power direct-connection projects (grid-connected and off-grid types)other (direct-connection access rule)—2025-05-21 —Key parameters: for grid-connected projects, annual self-generated and self-consumed electricity >=60% of total available generation and >=30% of total consumption (>=35% before 2030); annual feed-in in principle <=20% (set at provincial level); no reverse feed-in during consumption-constrained periods

Status and relations

Single-user green-power direct-connection framework (a dedicated line supplying green power to a single electricity user); extended to multi-user cases in 2026 by Fagai Nengyuan [2026] No. 688 (WA-DOC-2026-0102); this announcement has not been superseded

Record note

NDRC original text (signed 21 May 2025, published on the website 30 May 2025); key ratios cross-checked against the 2026 multi-user document and the NEA press Q&A.

Related documents

This page is the public record of one document in the WattAnalysis rules database — six verified databases on China's energy system and the rules around its trade. Every entry is checked against the issuing authority's own publication; status is tracked, not assumed.

Research & analysis — the WattAnalysis newsletter