The Landed-Cost Pass-Through model, live. Pick a product line and a destination: the calculator applies the live measure stack — every rate a registered measure with an ID you can check — to our cost bases and customs declared values, and lands the result in the US or the EU, for storage systems, cells, batteries and PV lines. Where the register has a gap, the gap is labelled — never filled silently. All output is model output, not observation.

The model’s first finding: The November 2026 cliff — the lapse of Announcement 72’s suspension on 27 November, which revives Announcement 46 paragraph 2 — is an export-control event, not a tariff event. Run the scenarios below: the duty stack does not move, the landed-cost delta is zero, and the whole of the exposure sits in export licensing. That is where the model prices it.

Base (FOB proxy)—
—
Duty — registered stack—
—
Landed cost—
Consignment landed total—
Pass-through arithmetic—
—

—

The three scenarios

The scenarios differ only in China-side export-control state. None of them changes a destination tariff — no destination measure raising these stacks is registered as pending, which is precisely the point the model was built to make.

S0 — Current (24 Nov 2026)Announcement 46 ¶2’s US-directed denial is suspended by Announcement 72 until 27 Nov 2026 (WA-POL-M-027, suspended). The October-2025 control package and the battery/materials controls are suspended until 10 Jan 2027 (WA-POL-M-026, WA-POL-M-036). Graphite licensing (WA-POL-M-024) has been in force since 1 Dec 2023 and was never suspended — it is the common baseline of all three scenarios.
S1 — Ann 46 revival (28 Nov 2026, conditional)If no extension is announced before 27 Nov: WA-POL-M-027 revives — gallium, germanium and antimony exports to the US are in principle not licensed, and graphite exports to the US face stricter end-use review. Duty delta: 0. The exposure channel is the graphite anode inside the cell.
S2 — Double cliff (11 Jan 2027, conditional)S1 plus the suspensions lapse: lithium batteries at or above 300 Wh/kg, cathode materials including high-compaction LFP, and artificial and mixed graphite anode materials (with related equipment and technology) require export licences (WA-POL-M-036, WA-POL-M-026). Mainstream LFP storage cells — below 300 Wh/kg — are not inside the battery item; their cathode and anode materials are. The binding channel is materials licensing, not a licence on the finished unit. Duty delta: 0.

How the number is built

Landed = base (USD) × (1 + τ). CNY bases are converted at 6.7827 CNY/USD (PBoC central parity, 2026Q3 quarterly average, T1). Freight, insurance, brokerage and destination taxes are excluded throughout.

Storage system (2h)Base 0.535 CNY/Wh equipment cost (WA-PRC-20, run COST-ESS-20261121-R1). US +25% (WA-POL-M-005) · EU 2.7% (WA-POL-M-011). Margin headroom on the comparison caliber: (0.58 − 0.535) / 0.58 = +7.76% — a comparison caliber, not an export quote.
Storage cell 280AhBase 0.354 CNY/Wh composite (WA-PRC-29, 11 Nov 2026). US +25% (WA-POL-M-005) · EU 2.7% (WA-POL-M-011). Cells are 64.5% of a 2h system’s equipment cost (0.345 / 0.535) — the upper layer at which the model quantifies export-control exposure; the anode share below the cell is not in the register (gap G4) and is not estimated.
Lithium battery (unit)Base 18.4179 USD/unit customs declared unit value (WA-PRC-23, Sep 2026). US +25% (WA-POL-M-005; EV batteries carry the same rate under WA-POL-M-003 — the two rows are mutually exclusive and never double-counted) · EU 2.7% (WA-POL-M-011).
PV module (integrated)Base 0.7454 CNY/W integrated full cost (WA-PRC-19, run COST-PV-20261121-R1). US +50% (WA-POL-M-002) · EU 0% (WA-POL-M-012). Margin headroom: the market transfer line (0.724 CNY/W) sits below full cost — (0.72 − 0.7454) / 0.72 = −3.53% — so at current prices the exporter has no room to absorb additional duty; pass-through is full.
Solar cell (unit)Base 2.4304 USD/unit customs declared unit value (WA-PRC-27, Aug 2026). US +50% (WA-POL-M-002) · EU 0% (WA-POL-M-012). Upstream polysilicon and wafers carry their own +50% US additional duty (WA-POL-M-004), which does not stack onto cells or modules.

Registered gaps, stated rather than filled. G1 — the register carries no route-level freight or insurance series, so EU figures are computed on the FOB proxy although EU duty is charged in law on CIF: the EU landed cost is a lower bound. G2 — US MFN base rates for these lines are outside the register’s scope, so US totals are the additional-duty stack only. G3 — the declared-value bases are global calibers, so both markets share one base and differ only in the rate. The model carries three falsifiable registry entries on this page’s claims — the Announcement 46 revival binary (28 Nov 2026), the US storage stack holding at 25pp through 2027-H1, and the EU battery stack holding at 2.7% through 2027 — scored in public on the Models page.

Run this on your own lines — the Compliance Desk

The public calculator covers five product lines and two markets on the registered stack. The Compliance Desk runs the full model on your HS lines, your routings and your suppliers: all 59 registered measures, licence-exposure mapping across both cliffs, and a landed-cost matrix you can put in front of a board. Consulting →

Indicative model output, not observation and not customs advice. Measure states as registered in the WattAnalysis policy database (WA-POL), assessed 24 November 2026; S1 and S2 are conditional events, not forecasts, and the sensitivity settings are the model’s sensitivity parameters, not registered measures. Verify classifications, rates and licence requirements with your customs broker before contracting.

Research & analysis — the WattAnalysis newsletter

Free weekly briefings and deep dives, built from primary sources.

Founding cohort. The first 100 subscribers are founding members. Membership is free, and remains free when paid tiers are introduced. This calculator runs on the live measure stack and cost bases behind the model library, rebuilt as the register changes.

Subscribe →