36 · Nuclear · SMR developers
SMR developers: China
DEFINITION
Ranked by stage reached — operation, construction, design
Developers are ranked by the furthest stage reached by their flagship small modular reactor — a unit of 300 MWe or less: commercial operation first, then construction, then design stage, with design-stage entries ordered by design maturity — detailed design, then preliminary design, then concept design. Capacities are the developers’ own published figures, or the IAEA SMR Catalogue 2024 figure where a developer’s own figure is ambiguous. Developers with a named design and a published capacity are ranked by stage; named entrants whose capacity is undisclosed — or whose existence rests on a single unverified mention — are still listed, at the foot of the table and labelled as such, as are ranked developers’ second designs, which are listed unranked with remarks.
Reading the table: CNNC runs the widest programme — beyond the ACP100 it fields a marine version (ACP100S, basic design) and the 400 MWt Yanlong (DHR-400) heating reactor, both at design stage; its 660 MWe HTR-PM600 unit at Xuwei, whose construction started in November 2026, is a multi-module scale-up above the SMR class and is not counted here. The HTR-PM is catalogued as an SMR by the IAEA; its 210 MWe is the catalogue figure (the operator’s gross figure is 211 MWe). The lowest entries are the sector’s private developers: Junhe Atomic, founded in 2025 by Tian Jiashu — a former deputy chief engineer of both CNNC and CGN who once chaired the Linglong One development company — Fenglin Nuclear, a CAS spin-out, and Azure Fulcrum, whose first-generation design is still in progress and whose capacities are undisclosed. Checked and not ranked: CSSC’s 719 Institute completed preliminary design of the HHP25 marine reactor (100 MWt / 25 MWe), but it is a naval research institute rather than an enterprise developer, and no programme activity has been verified since about 2019; Sichuan Energy Nuclear Industry, a provincial-SOE/NPIC joint venture unveiled in October 2026, has announced a 1–10 MWe microreactor programme but no named design.
Per-company SMR revenue, orders and programme spending: not published — not shown. A November 2026 census of private developers found no other publicly identifiable fission-SMR startup beyond the entries on this page: the ‘20-plus SMR startups’ figure quoted in Chinese media is an industry estimate, and the remaining projects tracked by investors are undisclosed.