Provisions on the Management of Power Grid Interconnection Operation

China · In force · Record WA-DOC-2021-0100

Document numberGuonengfa Jianguan Gui [2021] No. 60
IssuerNational Energy Administration (NEA)
JurisdictionChina
Issued2021-12-21
Review date2027-11-20
StatusIn force
Domaingrid, grid-connection, dispatch
WattAnalysis recordWA-DOC-2021-0100
SourceOfficial source (issuing authority) — tier T1, credibility B
Record updated2026-11-22

Measures under this document

ProductMeasureRateHS / HTS codesEffectiveStatus
Grid-connection operation management for dispatch-controlled generators, new-type storage and adjustable loadsother (grid operation management)— —Superior rules for grid-connection dispatch agreements, grid-related testing, AGC/AVC and assessment management

Status and relations

Applies to thermal, hydro, nuclear, wind, photovoltaic, solar-thermal and pumped-storage plants and own-use plants directly dispatched by provincial-level and above dispatch agencies, as well as new-type storage (electrochemical, compressed-air, flywheel, etc.) and adjustable loads

Record note

NEA government-information-disclosure original-text link (cross-checked this round against the public catalogue and subsequent citing documents; the original text was not opened verbatim, hence grade B); no separate effective date was verified in the original text, left blank.

Related documents

This page is the public record of one document in the WattAnalysis rules database — six verified databases on China's energy system and the rules around its trade. Every entry is checked against the issuing authority's own publication; status is tracked, not assumed.

Research & analysis — the WattAnalysis newsletter