Hybrid (multi-route) energy storage projects in China

8 projects in the WattAnalysis register

Every project in the register whose recorded technology route is hybrid (multi-route): Guangdong (3), Shandong (3), Inner Mongolia (1), Ningxia (1). Filed scale and grid-connected scale are recorded as separate calibers and never merged; a project's route is taken from its filing — where the filing states no route, the project is counted as not stated, not assigned one.

Coverage note: this page publishes the register's checkable layer — 220 projects across five provinces, each listed against its source document. The full WattAnalysis project database counted 858 projects in the November 2026 census, including provinces and capture channels not published here line by line. Both figures describe the same database at different coverage; neither corrects the other.

By status

StatusProjectsFiled MWFiled MWhGrid-connected MWGrid-connected MWh
Listed only2————
Filed / approved44501,232.5——
Grid-connected2——5001600

Capacity columns sum only the projects whose scale is recorded in that caliber. Across the full register, filed scale is recorded for 59 of 220 projects and grid-connected scale for 47.

All tracked hybrid (multi-route) projects

ProjectLocationTechnologyStatusFiled MW / MWhGrid-connected MW / MWh
600 MW / 1,800 MWh Integrated Energy Storage Station Demonstration Project (Phase 1: 300 MW / 800 MWh), Licheng District, JinanShandong — Jinan · Licheng DistrictHybrid (multi-route)Listed only——
Datang Zhongning 200 MW / 600 MWh Shared Energy Storage Project, Zhongning County, ZhongweiNingxia — Zhongwei · Zhongning CountyHybrid (multi-route)Listed only——
Dazhangzhuang Town Jiayang 200 MW / 382.5 MWh Standalone Energy Storage Project, Yiyuan County, ZiboShandong — Zibo · Yiyuan CountyHybrid (multi-route)Filed / approved——
Guangzhou Hybrid Standalone Energy Storage Station, Conghua District, GuangzhouGuangdong — Guangzhou · Conghua DistrictHybrid (multi-route)Filed / approved200 / 382.5—
Jiaobu Substation 150 MW / 450 MWh Grid-Forming Standalone Energy Storage Station, Tangxia Town, DongguanGuangdong — DongguanHybrid (multi-route)Filed / approved150 / 450—
Liangkou Town 100 MW / 400 MWh Standalone Energy Storage Project, Conghua District, GuangzhouGuangdong — Guangzhou · Conghua DistrictHybrid (multi-route)Filed / approved100 / 400—
Gushanliang Generation-Side Standalone Energy Storage Project (Xingchen Kechuang, 300 MW / 1,200 MWh), Dalad Banner, OrdosInner Mongolia — Ordos · Dalad BannerHybrid (multi-route)Grid-connected—300 / 1200
Heze Puyuan 200 MW / 400 MWh Standalone Energy Storage Station, Mudan District, HezeShandong — Heze · Mudan DistrictHybrid (multi-route)Grid-connected—200 / 400

All technology routes in the register

RouteProjects
Lithium-ion72
Lithium iron phosphate47
Hybrid (multi-route)8
Molten-salt thermal4
Compressed air4
Semi-solid / solid-state1
Zinc-bromine flow1
Hydrogen / fuel cell1
Gravity storage1
Not stated in the filing81

By province

Shandong (87) · Guangdong (59) · Inner Mongolia (45) · Ningxia (21) · Xinjiang (8)

Related

Fact page: storage projects by technology · Fact page: storage projects by province

Project names are WattAnalysis English renderings of the names as filed; the full register — with owners, investment as filed and voltage — is free to newsletter subscribers as an Excel workbook.

Research & analysis — the WattAnalysis newsletter

Free weekly briefings and deep dives, built from primary sources.